5/17/17 – Septic System 1

Today we started digging the septic system leech field. This is some challenging terrain because we have to dig 5′ down on the low side of the hill and up to 7′ down on

5/14/17 – Well Road

Kori did an amazing job digging out a temporary road for our upcoming well digging activity. The truck that is coming in needs an almost flat road that’s 8 feet wide because its 14′

5/13/17 – Driveway 4

Driveway day 4 was a doozy! Kori’s dad dropped by and Kori moved all the tree stumps I so lovingly abandoned on the side of the road. Quite a task for her first time