All of the roof panels have been installed as follows:
- RayCore structural panels with internal 2×8 cut to size to fit over each set of beams
- Minimum of 6 lag screws (per manufacturer) through each RayCore panel into beam with 2.5″ beam penetration
- Additional lag screws installed on perimeter panels where
- All joints taped closed per manufacturer
- 1/2″ OSB installed over top with 6″ O.C. nailing pattern with 8d 2-1/2″ ring shank nails